PALMERSTON NORTH PLAZA CARPARK
Written By AB
TONNES: 317
MAIN CONTRACTOR: Hawkins Construction
LOCATION: Palmerston North
JOB TYPE: Seismic Strengthening
Along with Hawkins, we were involved in this seismic strengthening project for the Plaza carpark in Palmerston North. Over 1,200 catch brackets were installed, along with some heavy Steltech ‘K’-Frames, to bring this structure up to code.