FIJI WATER
TONNES: 22
CLIENT: Fiji Water
MAIN CONTRACTOR: Richard Dudley
LOCATION: International
JOB TYPE: Structural Engineering
For this project, members of our team jetted off to the South Pacific to erect this building for Fiji Water. The stainless platform required 27 tonne of galvanised steel for the structure, and a further 22 tonne of stainless handrails and chequer-plate flooring. Designed and fabricated at our workshop in Whakatu, the structure was shipped over to Fiji in 40 foot containers.