WAKEFIELD HOSPITAL, STAGE 2
Written By AB
TONNES: 950
CLIENT: Evolution Healthcare
MAIN CONTRACTOR: Hawkins
LOCATION: Wellington, NZ
JOB TYPE: Structural Engineering / Seismic Strengthening
Due for completion in 2024, this significant project has seen $166 million invested in the redevelopment of the Evolution Healthcare Wakefield hospital complex in Wellington. Patton Engineering provided structural engineering and seismic strengthening to ensure that this is the safest, private hospital in the heart of Wellington.
MORE
Featured
Our team put in months of hard work to fabricate, weld and assemble approximately 45 tons of drive gear, chains and gearboxes for the new log infeed system at Qube Holdings Napier’s de-barker. The transport process which required five truckloads went smoothly and with precision and determination, the installation was smooth and efficient. This project included custom-fabricated components.