Projects

M B Century Geothermal
Steam Silencer

Under contract to M B Century, Patton Engineering has to date fabricated 5 Geothermal Steam Silencers to varying designs.

Welding has been to high standards to AS/NZS 1554, and although not a requirement was actually welded by ASME qualified welding staff. At the completion of fabrication, both internal and external surfaces of the steelwork are abrasive blasted and painted using specified Altex coatings.