Patton Engineering worked under a local construction company on this building, MB Brown Ltd. The company’s director Stephen Brown lead the charge from the start and was a pleasure dealing with. We supplied and installed approximately 104 Tonne of structural steel over a one-and-a-half-month period. This is one of the largest buildings to greet you as you drive through Masterton on your return journey back from Wellington. The site teams did a great job in erecting the building ahead of the builder’s schedule which enabled them to have a smooth run of the entire construction phase.