Pan-Pac Boilers 1 and 2
Ash Conditioning

In 2015, Patton Engineering Limited undertook the structural fabrication elements of a new ‘Pug Mill’ installation to Pan Pac Whirinaki’s Number 2 Boiler.

Mechanical equipment was supplied by Pan Pac, and Patton Engineering undertook all site installation works in an extremely short time frame.

In 2017, Patton Engineering Limited undertook full project management for structural modifications, new structures, new equipment procurement; surface treatment and site installation of a similar ‘Pug Mill’ to Pan Pac Whirinaki’s Number 1 Boiler, however this time as a ‘Turn-Key’ project with Patton Engineering assuming responsibility for all aspects of the project from design through completion.